HI,
Short answer: scontrol update jobid=JOBID arraytaskthrottle=NEWLIMIT
Long answer: https://bugs.schedmd.com/show_bug.cgi?id=1863
jbh
On Sat, Feb 24, 2018 at 5:55 AM, Bill Barth <bbarth at tacc.utexas.edu> wrote:
> We don’t allow array jobs (we have our own tools for packing small jobs
> into bigger ones), so I can’t look at this myself, but what does ‘scontrol
> show job <jobid>’ show for this job? If you can find the ‘4’ in this job as
> some named parameter, you ought to be able to do an ‘scontrol update job
> <jobid> ThatParameter=100’ or whatever you like to change it.
>
> --
> Bill Barth, Ph.D., Director, HPC
> bbarth at tacc.utexas.edu | Phone: (512) 232-7069
> Office: ROC 1.435 | Fax: (512) 475-9445
>
>
>
> On 2/23/18, 11:13 PM, "slurm-users on behalf of ~Stack~" <
> slurm-users-bounces at lists.schedmd.com on behalf of i.am.stack at gmail.com>
> wrote:
>
> Greetings,
>
> I have a user that submits many many many jobs at once in an array.
> Happily, he's a very nice user and doesn't often cause trouble.
>
> The documentation for the job array
> (https://slurm.schedmd.com/job_array.html) says:
> "A maximum number of simultaneously running tasks from the job array
> may
> be specified using a "%" separator. For example "--array=0-15%4" will
> limit the number of simultaneously running tasks from this job array
> to 4."
>
> Awesome. That's exactly what he is doing.
>
> A big job recently just finished and I'm looking at my queue noticing
> that no one bothered to load it to the brim this weekend leaving me
> with
> several idle compute nodes. Meanwhile, this user has got quite a few
> jobs still waiting to run with a "JobArrayTaskLimit". :-/
>
> I've been poking at it for the last 20-30 minutes, but I'm not seeing
> how I, with the power of root, can update his own "self imposed" array
> limit. It's late, my attempts have not worked, and my google-fu isn't
> returning any helpful results. I'm not really concerned by it, but I
> would like to know should this happen again.
>
> How can I increase a JobArrayTaskLimit?
> So using the documentation example, how would I "scontrol update" the
> array to be "--array=0-15%6" when jobs 0-3 are already running?
>
> Or maybe just say "Grab X number of jobs and run them anyway"?
> So again with the documentation example, maybe 0-3 are done, 4-7 are
> running, and I just want to manually tell 8-10 to run anyway on
> available resources leaving 11-15 under current constraints.
>
> Thank you!
> ~Stack~
>
>
>
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.schedmd.com/pipermail/slurm-users/attachments/20180301/143f4bad/attachment.html>
More information about the slurm-users
mailing list